Today Is A Great Day!(Hopefully)


WizardStan said:
...
Only if the intentional radiator isn't already certified, which MWeston long ago said he had the documentation to prove that it had been. I'm too lazy to look it up though, so might be missing something.
Oh Mali? :D
MWeston was wrong about that, i.e. --> http://www.gp32x.de/board/index.php?/topic/50074-fcc/page__view__findpost__p__765266
 
Last edited by a moderator:
jumpman said:
aliking said:
@Jumpman: not sure how you translate..
craigix said:
We're told to expect photos and courier details tomorrow.
...into...
jumpman said:
Alright, lets Rock & Roll! April 1st here we come!
...?

What are you expecting to happen on April 1st?
Well I'm hoping assembly until told otherwise, or the next delay of course! ;)


Chris
I'm sure that second will be.
Something like
We got only 5 cases instead of 500 and cases is absolutely nasty.
We will test these cases for next 3 month.
We can't communicate with factory.
etc
 
Last edited by a moderator:
Dear all,

Isn't it impossible to install a filter to redirect the post of complaining, of unconstructive criticism, in a special topic "escape valve"... It's really a pain to waist time reading always the same song of pessimism ...

If you are not happy just cancel, let the Pandora to the others (and let me have mine before mouahahahHAHAHAHAH).

Or it should have a counter, each time you spit out your place is incremented, and if you exceed the place 4000 ... "You'll have just your eyes to cry" (bad translation of a French expression).

ThX to the Pandora team. Take care to your heart, I imagine that it is not easy every day ...
 
Hi,
craigix said:
We're told to expect photos and courier details tomorrow.
Please let us know when you have news from the factory :)
Bye and thanks, Magic Sam
 
Last edited by a moderator:
Bosbeetle said:
Funny thing this thread works over several days. So now today is gonna be a great day :)

this thread should be around forever! Great days forever!
No no, TOMORROW is always going to be a great day. Today? Not so much.
 
Last edited by a moderator:
craigix said:
They sent a list of all the parts to be shipped and a bill.

No photos yet.
Did the list of all the parts shipping, include "ALL" the parts?


Chris
 
Last edited by a moderator:
craigix said:
They sent a list of all the parts to be shipped and a bill.

No photos yet.
Sounds like this time they really did, what they told before. :D I hope, the Parts are already on its way, because we have the 24. and they wanted to ship 23.
Sadly, we still don't know the "final" overall Quality of the Cases. And I guess untill this is checked, none of the other 9K Cases is beeing made. I hope, the chinese Factory don't need months to make these Cases, the already needed 2 weeks for 1000 units which is a little bit weird.
I really hope, their next free time slot for Pandora will be not too far in the Future.
 
Last edited by a moderator:
craigix said:
They sent a list of all the parts to be shipped and a bill.

No photos yet.
Thanks for keeping us up to date, Craig. You guys must be spitting teeth that they keep dragging this out. Hopefully you all won't be sitting around in the hall with nothing to do.

I'd like to propose a motion from the forums that the webcam gets turned on April 1st regardless of whether everything has arrived. That would be good for a laugh :D
 
Last edited by a moderator:
Zotty said:
I just hope that bill has been payed :lol:
no, I would cut off 100$ from the bill every day, the factory delayed something. :D I guess, this way the OP Team would get money back from the Factory at the end. :lol:
 
Last edited by a moderator:
craigix said:
They sent a list of all the parts to be shipped and a bill.

No photos yet.

a bill? i thought you'd paid everything log time ago.

anyway, hope that the time of the 'to be shipped' is not too far in the future.
 
Last edited by a moderator:
hch said:
craigix said:
They sent a list of all the parts to be shipped and a bill.

No photos yet.

a bill? i thought you'd paid everything log time ago.

anyway, hope that the time of the 'to be shipped' is not too far in the future.
Maybe the bill is for shipping, not production?
 
Last edited by a moderator:
Is this referring to the parts left in the US, or the case parts?
 
A bill of materials, waybill... I'm sure, unless the payment was arranged to be made in installments, as the parts are delivered.
 
mali said:
socket said:
Maybe Cosurgi will start another keyboard poll soon. ;-)
Cosurgi is a cool dude. It's ok to fight for something someone finds important :)
Thank you, thank you, thank you :)

BTW: my state of anxiety is reaching the (1+1/n)^n limit at n→infinity.
 
Last edited by a moderator:
So they basically sent a ransom note... heh.

Is the list of parts at least a complete one or are they going to send a follow up with a severed shoulder button?
 
Back
Top