VRAndy said:
When was lead time for parts ever 6 weeks, maybe I missed that. Eitherway they always stated their intention not to ship the 2nd batch prior to summer 2010. Which was to have a bit of a break.
"Always" is a strong word. They used to say that Batch #2 might go out as early as January '09.
As early as Jan 2010 when first batch was due August probably hahaha.
@Poem58
So the second batch timeline has to move in line with the 1st. The reason I pri-ordered last year, is because how long it was to the second batch. Even if it was 6 weeks before, we have been told that the lead time is from TI, maybe a year ago they never had such a long lead time, so the circumstances around them has changed and they've told us.
The pandora nubs hasn't changed therefore if the icontrol has, it's still using the current set of nubs. Thats my point. So I still think it's a pretty big assumption that the redesign of the iControl impacted on the Pandora, and in the end I really don't think they would've allowed it to, it would've just happened on the second batch. I just believe your assumption is bigger than mine, but either could be wrong I guess. They've said it themselves it's even more niche than the Pandora, well actually said no idea how it will sell. The longer Pandora takes the less people will take a risk on iControl, even when it is released as their track record isn't great at the moment, and something that needs to be worked on.
Pandora has been seriously delayed, and a lot of people has waited but OP know it's not doing themselves any good.
Personally I think most of the delays have been accounted for (lots are plain old bad estimation), There's some delays that I don't feel has truly been accounted for, I just happen to think the ones you have chosen to highlight aren't them.
Would I say I'm in it for the long haul, I would like to but I can see myself getting a refund if I don't get it this year, then just order a 2nd batch
IF I order again. No telling what I'm going to do to be honest.
Not because I think it's a scam, but because I think I've been more than fair waiting. Sure maybe nothing else like it on the horizan at the moment but never know what the new year will bring, so I may just change my priorities to fit what's out there.
Poem58 said:
It's just I've started to realize that I too was rationalizing everything about this project and when I sat down and asked myself, there were too many things I just couldn't answer. Shouldn't be that way for something so close to completion and something I have followed so long.
Can totally see where your coming from here, although I wouldn't say I'm rationalising it the way you mean.
I've been working on something for close to 8 months which should've taken a month tops. Nothing to do with me the delays and it's doing my head in, so yea I can see how things can get severaly delayed and any reason you give starts sounding like an excuse, just glad the bosses are seeing it all with their own eyes
But it's really doing my head in
Considering this is kinda a general thread slightly off topic.
How did the job interviews go guys? Few people from last week.