as far as i can interpret from the dozens of small infos we got in the last days, the shedule is the following:
1. waiting for the already ordered transparent cnc-parts to arrive at mweston, probably next week
2. mweston assembling the prototype and doing some basic tests
3. a) mWeston finds problems, goto 1
3. B) MWeston is happy with the prototype, goto 4
4. sending the prototype to ED or ordering new parts for ED
5. a)CE-testing fails, goto panic
5. B) CE-testing approved, molds get ordered (4 weeks)
6. Cases get produced (1-2 days if factory is booked in time)
7. sending the cases to factory in US
Parallel to that
1. The keymats are prepared and hopefully produced soon.
2. test-mass-production of the boards should already have started.
1. waiting for the already ordered transparent cnc-parts to arrive at mweston, probably next week
2. mweston assembling the prototype and doing some basic tests
3. a) mWeston finds problems, goto 1
3. B) MWeston is happy with the prototype, goto 4
4. sending the prototype to ED or ordering new parts for ED
5. a)CE-testing fails, goto panic
5. B) CE-testing approved, molds get ordered (4 weeks)
6. Cases get produced (1-2 days if factory is booked in time)
7. sending the cases to factory in US
Parallel to that
1. The keymats are prepared and hopefully produced soon.
2. test-mass-production of the boards should already have started.