marshal
Member
I think they are going to wait until the first 1000's cases arrive and check if they are okay. I really hope the cases will arrive quickly and are okay so that they can give the green light once again.
Gruso said:The boards are tested thoroughly before leaving Texas. A quick power up and test of the main functions is probably all they need to do before shipping.
gp32rich said:That'd be do-able if it were being done at the factory - but in a village hall the equipment available may not be as thorough.
may88 said:craigix will still be quivering with rage for another 2 weeks or more.
Asmo said:may88 said:craigix will still be quivering with rage for another 2 weeks or more.
aq21 said:Gruso said:The boards are tested thoroughly before leaving Texas. A quick power up and test of the main functions is probably all they need to do before shipping.
The wifi is certainly not tested in the 700 boards, since it is not yet built correctly.
So what is the current speed of the Wifi? Is it higher than 500KB/s now?EvilDragon said:aq21 said:Gruso said:The boards are tested thoroughly before leaving Texas. A quick power up and test of the main functions is probably all they need to do before shipping.
The wifi is certainly not tested in the 700 boards, since it is not yet built correctly.
It is. They test if the module loads the firmware correctly.
That confirms that the module is working fine.
+1 - Very good (as usual)matenrou said:Asmo said:may88 said:craigix will still be quivering with rage for another 2 weeks or more.
<snip Asmo's lovely image>
hehe love it
I really don't know where you get 4-6 months away? and I do plan to order from my link the second I hear a review from someone on these boards with a Pandora in their hands. With any luck some will be shipped soon but but not all since there are only around 500-700 ready to put together.may88 said:A Pandora in the hand is worth two in the 2nd Batch. Order it. It may have its flaws but it will still be largely usable.TylerAW said:Thank you for you're kind words that is like a grace from the gods if that worksGruso said:Hold on to the checkout link for as long as they (OPT) will let you. You might have enough time to see the first ones delivered (at which point there will be a ton of reviews and feedback) and still have time to get into the first batch.
And if you're geek enough for it then the this in itself is fun. Waiting for this patch or that patch to be developed and release.
2nd Batch may be a while off (4-6 months - guessing). The OPT has said that the OS/software is the next focus and they'll want a rest from natural disasters, translation problems, resistors and delivery men. Parts are on order so I'm sure they'll not sit on them for too long.
Good question. There was going to be a quality check after the first 700/1000 cases. MWeston has seen the new painted cases and is happy with it.Reyhn said:Are the chinese building more cases by now, since they shipped the first ones and cases are good for mass production ?
Not sure if that was enough for the final go-ahead for the remainder of the 10,000, of if the OPT want to build a few for real first.