1400 in the wild, 500 more boards done, 100-200 Pandora being assembled. I said we were almost halfway thru Batch 1. Half of 3900 is 1950, almost that many boards are done. Bottleneck is now LCD cables.
@Greendots: The gap is nowhere nearly as noticeable as my first case.