So from this moment forward is there any Pandora's being built for pre-orders
or is there a stand still while waiting for parts ?
If so what parts are we waiting on .. Thanks Bud :)
 
Right now we are almost half way through those who preordered from Batch 1. I think there are over 1000 sold from Batch 2 that were preordered as well. There will be no break in production/assembly of units between Batch 1 and Batch 2.

Parts we are waiting on:
TV Out Cables
Boards
LCD cables

At this point, boards are the bottleneck.
 
I have a question too... What is the quality of the new shipping pandoras? Is there still a bend in the lid creating a gap when its closed?
 
They're certainly not halfway through batch 1 if you mean fully-finished and shipped Pandoras, maybe a bit over a quarter at best. Thankfully, things now seem to be moving very quickly at last.

I saw a review on the other forums which said that the gap in the benzel is no longer there.
 
^
1400 in the wild, 500 more boards done, 100-200 Pandora being assembled. I said we were almost halfway thru Batch 1. Half of 3900 is 1950, almost that many boards are done. Bottleneck is now LCD cables.