I can remember that EvilDragon postet some pages ago that the Email seems to be from more than two months ago, as they seems to had problems whit they’re email server..
So whe Hope for the Moulds carefully arrived at the better case factory..
I still don’t understand if the whole PCBs are in massproduktion or
Are the Platines allready at Stock and they only need to put the stuff on it (Populate)
And how long will this take??
I have time: I have lots of EBooks to read, a pretty big backlog on the Xbox and Switch, etc ..
So whe Hope for the Moulds carefully arrived at the better case factory..
I still don’t understand if the whole PCBs are in massproduktion or
Are the Platines allready at Stock and they only need to put the stuff on it (Populate)
And how long will this take??
I have time: I have lots of EBooks to read, a pretty big backlog on the Xbox and Switch, etc ..