CCmachined
Member
- Joined
- Nov 3, 2007
- Messages
- 347
We've all pretty much accepted that the units will not be shipped by Xmas.
Presuming all stages that're left require small tweak time (as has been the case 99% of the time it seems), what is a reasonable expectation?
Presuming all stages that're left require small tweak time (as has been the case 99% of the time it seems), what is a reasonable expectation?