Well, we just got some new timeline for the further production of the new nubs.
As promised a week ago, basically everything is setup for mass production.
The sample run will happen during the next days and these parts will ALL be inspected to work.
(Remember that a lot of nubs didn't work properly from the very beginning? We don't want that to happen again.)
After that, some sample is being sent to Michael (probably end of this week / beginning of next week).
If he approves it, then the real mass production run can start, which should only take a 1 - 1,5 weeks until all needed nubs have been produced.
Let's hope the board procuction company is on par with the nubs, and then delivery should resume again - and hopefully way faster than before (well, it all depends on the board company, as we've already setup everything we can so far).
As promised a week ago, basically everything is setup for mass production.
The sample run will happen during the next days and these parts will ALL be inspected to work.
(Remember that a lot of nubs didn't work properly from the very beginning? We don't want that to happen again.)
After that, some sample is being sent to Michael (probably end of this week / beginning of next week).
If he approves it, then the real mass production run can start, which should only take a 1 - 1,5 weeks until all needed nubs have been produced.
Let's hope the board procuction company is on par with the nubs, and then delivery should resume again - and hopefully way faster than before (well, it all depends on the board company, as we've already setup everything we can so far).