October 30th


lol ,when i worked in electronics the tests were of a software test that tested all of the hardware modules,this would be a list of tests like sound,display,wifi and so on,and if they passed each module the system would say pass in large writing,takes about 8 mins and the unit can be sent off to packaging.

so as they come off the line the testers would do 5 or 6 at a time and they
would sit in a test bay for 8 mins ,and say theres 10 testers per line,10x5=50
tested every 8-10 mins,per line,2 days worth for the 4000,depending on the
place of manafacture.


(HEHEHE - i could barely write that post,from reading Kloplop321's idea of a one man production line)

can imagine EvilDragon on a swivel chair with wheels flyin down a long table full of pandora's at
2 in the morning - Craigix says - gota get these done faster man.
 