Monk
Caveman Ninja
I'm going to answer OOO...
Yes. Although there's riskj of confusing the newbies - wel, doesn't that pretty much describe a newbie? It's pleasant to have any kind of discussion where one can debate/consider possibilities without the fear of getting peoples backs up - there's been FAR too much of THAT, so this little threadette comes as a nice change
I'm going to feel dirty after doing this, but it kinda supports my hypothetical situation - the more positive one I keep saying is POSSIBLE, even if I'm not confident of it enough to force a cancellation my first batch order:
Ptooft. I was right - I DO feel dirty. Now - where was I? Oh yes - that line supports my general proposal that there's no difference between the chips but marking. Imagine this hypothetical scenario.
1. TI makes some chips, and flogs them to run at "600MHz, at least".
2. TI tests a few chips and find they all run at 720MHz.
3. TI tests a few more chips, as they fly past production, and finds they ALSO all run at 720MHz. TI smile slyly.
4. TI tests a whole bunch more chips and find they ALL pass at 720MHz or higher. TI grin manically. They have A PLAN....
Times are hard. They can't raise the price of the existing product and say "Hey chaps, you can drive them faster" because they will lose customers who won't (or can't) afford to pay the higher price. They can't charge different customers drastically different prices because they will get called names in the playground (some variation, yes, but there ARE limits). So they hatch a plan.
5. Since they have found that ALL the SOCs work at 720MHz, they introduce a second product line - the same product, but "binned" as guaranteed to run at 720MHz "or faster". The binning process, in its entirety, consists of redirecting some of the SOCs produced to a different labelling machine, that stamps "720" instead of "600" on them. Voila! They can charge more for those items for the PROMISE/GUARANTEE that they will work at 720MHz. No more, no less, than a paperwork excuse to charge more.
Now - I can't say that this is exactly what IS happening, but (based on previous CPU manufacturer behaviour, as well as the twisted logic of Marketing) this is a realistic POSSIBLE scenario. Which would, in and of itself, mean that whether 2nd batch people got 600MHz or 720MHz SOCs would make no difference at all, functionally - they would both actually be getting the exact same silicon AND performance as first batchers. The only difference would be the shape of some ink, and the cost to OpenPandora.
I struggle to believe it, but it wouldn't be the first time something like that has actually happened.
I need to go and wash my hands now, after quoting Craig in a positive light. Yuck!
All the 600's might be "720 chips" sold rated at 600 so that they can make money at both the "$high$" and "$low$" ends of the market, with only one manufacturing pipeline... but yes, the fact that Intel have already done this (more or less) in the past is what makes it seem possible, for me, that TI could be doing this on a wholesale basis with this SOC.
Dunny said:But isn't this fun?
Yes. Although there's riskj of confusing the newbies - wel, doesn't that pretty much describe a newbie? It's pleasant to have any kind of discussion where one can debate/consider possibilities without the fear of getting peoples backs up - there's been FAR too much of THAT, so this little threadette comes as a nice change
Dunny said:Actually, we don't know how TI are doing the testing. If they test at 720 and bin them in "can clock, can't clock" then we have guaranteed 720s and "can go up to somewhere between 600 and 720". So in that case, hypothetically of course, the 2nd batch should be overclockable by an unknown amount which varies from unit to unit, up to 720MHz. The 1st Batch will be able to overclock, and again this will vary greatly from unit to unit, anywhere from 600MHz upwards to an unknown ceiling.
I'm going to feel dirty after doing this, but it kinda supports my hypothetical situation - the more positive one I keep saying is POSSIBLE, even if I'm not confident of it enough to force a cancellation my first batch order:
craigix said:It's worth knowing that we are yet to come across a chip which can't reach 720mhz.
Ptooft. I was right - I DO feel dirty. Now - where was I? Oh yes - that line supports my general proposal that there's no difference between the chips but marking. Imagine this hypothetical scenario.
1. TI makes some chips, and flogs them to run at "600MHz, at least".
2. TI tests a few chips and find they all run at 720MHz.
3. TI tests a few more chips, as they fly past production, and finds they ALSO all run at 720MHz. TI smile slyly.
4. TI tests a whole bunch more chips and find they ALL pass at 720MHz or higher. TI grin manically. They have A PLAN....
Times are hard. They can't raise the price of the existing product and say "Hey chaps, you can drive them faster" because they will lose customers who won't (or can't) afford to pay the higher price. They can't charge different customers drastically different prices because they will get called names in the playground (some variation, yes, but there ARE limits). So they hatch a plan.
5. Since they have found that ALL the SOCs work at 720MHz, they introduce a second product line - the same product, but "binned" as guaranteed to run at 720MHz "or faster". The binning process, in its entirety, consists of redirecting some of the SOCs produced to a different labelling machine, that stamps "720" instead of "600" on them. Voila! They can charge more for those items for the PROMISE/GUARANTEE that they will work at 720MHz. No more, no less, than a paperwork excuse to charge more.
Now - I can't say that this is exactly what IS happening, but (based on previous CPU manufacturer behaviour, as well as the twisted logic of Marketing) this is a realistic POSSIBLE scenario. Which would, in and of itself, mean that whether 2nd batch people got 600MHz or 720MHz SOCs would make no difference at all, functionally - they would both actually be getting the exact same silicon AND performance as first batchers. The only difference would be the shape of some ink, and the cost to OpenPandora.
I struggle to believe it, but it wouldn't be the first time something like that has actually happened.
I need to go and wash my hands now, after quoting Craig in a positive light. Yuck!
WizardStan said:On the other hand, they may find they have a surplus of 720 chips and have to sell them rated at 600 because there's still a market for them, a la Intel.
All the 600's might be "720 chips" sold rated at 600 so that they can make money at both the "$high$" and "$low$" ends of the market, with only one manufacturing pipeline... but yes, the fact that Intel have already done this (more or less) in the past is what makes it seem possible, for me, that TI could be doing this on a wholesale basis with this SOC.
Last edited by a moderator: