What do we have?
The board is finished and polished, MK3 works 100% and no more revisions are needed, now it's the factory which has to produce the boards with a low error margin (big step mounting those 0,4mm SoCs, it's bleeding edge) . But everything works already, even battery (although we didn't see a battery in a video but it's implied, and have been discussed, and even improved the circuitry since the first revisions. They're receiving the prototypes now. While continuing building and improving the OS. And they are showing some of the candy from time to time. Now it's about to fit the case/mat/screen together, and giving the last instructions and corrections needed before some serious production can start.
QUOTE
Again, it would be madness to produce 4,000 cases before they've been assembled.
And that is why they are doing this at the pace it needs to be done. One step at a time. The thing is that the crisis+Christmas isn't helping on receiving things faster. But all seems under control to me.
QUOTE
I'd be surprised if it ships before february. However, I'll go out on a limb here and predict that there will be another sabotage attempt by those who are trying to stop it, and it will be at least 3 months yet.
Well, future is open, but if nothing unexpected happens I'd bet the first units could be shipping on late january, most of them in february. I can't see anything more needing more than one month in order to finish it.
gibberish said:
february is optimistic. we have nothing yet, just some prototype parts. it wont ship until april, may or possibly june imo... such a shame.
lol, I know this time of the year could be a little deppresive
But there's no need to anticipate the worst future and suffer on imagination. If you don't want to stress yourself you can always ignore the forums and return to check them again in one month, that's what some people are doing. We'll probably have many more good news by then.