Hi,
This is my first post here, I'm a programmer in my small local company, I have experience on using GLBasic and some GCC.
I'm very excited about the production of Pandora, and I've prepared $500 for Pandora and it's accesories, there're some questions that I want to know about
1.Is the first batch of Pandora considered as the final(ie, not a prototype)?
2.Will the following batch has some minor changes or quality down?
3.Is the warranty/liabilities the same as when Pandora goes to GBAX stores?
Thanks, really want to get one but wanting to know about the future issues.
This is my first post here, I'm a programmer in my small local company, I have experience on using GLBasic and some GCC.
I'm very excited about the production of Pandora, and I've prepared $500 for Pandora and it's accesories, there're some questions that I want to know about
1.Is the first batch of Pandora considered as the final(ie, not a prototype)?
2.Will the following batch has some minor changes or quality down?
3.Is the warranty/liabilities the same as when Pandora goes to GBAX stores?
Thanks, really want to get one but wanting to know about the future issues.