craigix
Mega GP Mania
Hello everyone,
Today is the last day of my medication and I'm pretty much better aside from a sore nose (I don't know).
Well, last week was a bit of a disaster due to me being unable to work for half of it, although I did manage to flash 210 consoles and was very very
active on the forums, that seemed to be a side effect of the meds, it was strange.
I've been working all weekend to catch up, I'm hoping to sleep at some point soon.
7Day units have been fantastic, I think every single one of you so far has had it shipped in 7 days (often the next day even). We hope this is
a sign of things to come, I finally feel like we're getting somewhere. I've not been lying awake so much at night worrying. I can't thank you
all enough for sticking with us on this.
So, this coming week, what's happening?
Well tomorrow (If UPS are good chaps) we should have 300 new boards to get going with, we really want to try to do all those in 2.5 days.
Also these are the first boards with the shoulder microswitches apparently in exactly the right place, if that is the case then it will speed
things up even more, getting to the point where putting the screws in and flashing the units is the bottleneck (which can't be beaten).
Will try to keep this updated all week with how it's going, I'm excited about clearing more and more units and also loving your reviews and videos and new software. Great stuff.
Thanks,
Craig
Today is the last day of my medication and I'm pretty much better aside from a sore nose (I don't know).
Well, last week was a bit of a disaster due to me being unable to work for half of it, although I did manage to flash 210 consoles and was very very
active on the forums, that seemed to be a side effect of the meds, it was strange.
I've been working all weekend to catch up, I'm hoping to sleep at some point soon.
7Day units have been fantastic, I think every single one of you so far has had it shipped in 7 days (often the next day even). We hope this is
a sign of things to come, I finally feel like we're getting somewhere. I've not been lying awake so much at night worrying. I can't thank you
all enough for sticking with us on this.
So, this coming week, what's happening?
Well tomorrow (If UPS are good chaps) we should have 300 new boards to get going with, we really want to try to do all those in 2.5 days.
Also these are the first boards with the shoulder microswitches apparently in exactly the right place, if that is the case then it will speed
things up even more, getting to the point where putting the screws in and flashing the units is the bottleneck (which can't be beaten).
Will try to keep this updated all week with how it's going, I'm excited about clearing more and more units and also loving your reviews and videos and new software. Great stuff.
Thanks,
Craig