  1. Zwerg01

    Open... and close... and open...

    Two interessting facts in one tweet. First, maximum cpu frequency(full speed) is now 1 Ghz and not 1.5 Ghz. Second, without heatsink it is not possible to operate at full cpu load even at 1 Ghz, because thermal throtteling will kick in. Summarized, a propper heatsink has to be developed, tested...
  2. Zwerg01

    Open... and close... and open...

    Not a major issue? You will not geht CE or FCC-label and cannot sell the pyra in europe or usa.
  3. Zwerg01

    Keep cool!

    You will not get any money back if that happens.
  4. Zwerg01

    Keep cool!

    With no i mean, the cpu boards have not been ordered yet. They are only "ready for mass production".
  5. Zwerg01

    Keep cool!

    No. This electrical analysis and simulation was unneccesarry. It was impropper setting in uboot.
  6. Zwerg01

    Keep cool!

    So, the slow mux/emmc is now a feature and not a bug?
  7. Zwerg01

    It's all white!

    But therefore loud as hell.
  8. Zwerg01

    Playing with Play-Doh

    I said emmc controller, not emmc chip. Renesas automotive mcu introduced 2011 is d'cont last year. Place last order until 2018. loooooooooonnnnnngggggg time. lol. It is always depending on the policy of manufacturer.
  9. Zwerg01

    Playing with Play-Doh

    You build a hardware plattform around the CPU and not vice versa. it is nearly impossible to find a CPU that can replace the old one. other architecture has other voltages, current draw, thermal dissipation. and then it has to have the same features like emmc controller, image rotation, MIPI for...
  10. Zwerg01

    Playing with Play-Doh

    they have prototypes right now with few issues with the hardware, the case and some more open points with the software. I would estimate at least 6 month for production (in detail, bugs have to be fixed until sept/oct (aug is holiday season, then you have to scedule mass production, shipment of...
  11. Zwerg01

    That took a while...

    Ok, and the plate is ready and tested?
  12. Zwerg01

    That took a while...

    What is with this hole on the back side of the screen?
  13. Zwerg01

    We've started to order things!

    It has more to do with incompetence, not with issues. I've never heard of a hardware project that took so much time, even if it only was a "hobby" project. An it is still under development. If you have a closer look at what happened in the last three month (one issue fixed, two new came up plus...
  14. Zwerg01

    News from the meeting at GC

    There is only one person critizising and it has multiple accounts here in the forums.
  15. Zwerg01

    News from the meeting at GC

    Hi, i read all the news posts and i can answer your question with the standard answer. Everything ist ordered right now. Basically. Nearly. Almost. Everything. Except of a few parts that CAN be ordered very quick, as long as ed realizes that they CANNOT ordered very quick. Then there will be a...